19th AW executes Rocket Launch rehearsal

A loadmaster from the 61st Airlift Squadron downloads cargo from a C-130J Super Hercules after completing a 30-hour endurance mission at Little Rock Air Force Base, May 17, 2023, after a 30-hour flight. Two C-130J Super Hercules conducted 30-hour single-aircraft endurance missions, demonstrating multi-day mission generation capabilities. For more than 30 hours, the aircraft only landed to refuel. This mission was accomplished with crews from the 61st and 41st Airlift Squadrons continuously operating two C-130s to demonstrate the fleets ability to project agile combat airlift. (U.S. Air Force photo by Airman Julian Atkins)

PHOTO BY: Airman Julian Atkins
VIRIN: 230517-F-BK002-1094.JPG
FULL SIZE: 3.22 MB
Additional Details

CAMERA

NIKON Z 7_2

LENS

NIKKOR Z 24-70mm f/2.8 S

APERTURE

45/10

SHUTTERSPEED

1/1250

ISO

1600

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.